
St Gabriel’s Primary School Master Plan
Address: Reservoir VIC 3073
Authority: Catholic Education Melbourne
Year Levels: P to 6
Status: Stage 01 Construction Commenced Feb 2021
The master plan for this tight site focuses on modernisation of facilities, reintroduction of natural environment and reassembly of community facilities to provide a cohesive and excellent facility for the learning community. Edwardian era building stock is readapted to provide modern, flexible and multipurpose learning facilities with a science based discovery centre that connects to outdoor productive gardens. Along with a focus of reducing hard paving , the outdoor spaces provided extensive natural outdoor learning and play spaces with a central garden spore in the heart fo the school that provides a garden backdrop and outdoor space to all internal learning spaces. The community hall is reconnected to a competition size netball court to increase community use and optimise income streams to the school.
Spatial Analysis Plan
Stage 01 Junior Block B (Under Construction)
Learning Block A – Stage 03
Learning Block A – Stage 05